BESIX 3D Headquarters Facade

The façade of the new Dubai headquarters is one of BESIX 3D’s first and pioneering projects of 2020. It is the largest 3D concrete printed façade in the world. The façade consist of 290 panels, each one printed in 3D concrete in their adjacent lab. On average, each panel took about 10 minutes to be printed. Read more at: https://www.linkedin.com/posts/besix3d_3d-concrete-printing-activity-6630403737464770560-6ZeZ/