Project Description
This Case Study showcases all 4 of our disciplines, Architecture, Structure, MEPF and Landscape in a single model at our LoD 350 standard. The model contains 3 buildings, 11 storefronts and two rail systems below. Coordinating with the MTA / LIRR was a huge learning experience for us as we continue to work in transportation projects.
Project Overview:
-Project Type: Commercial with Transportation
-Size: Over 32,000 sqft
-Scan Duration: Completed in 3 days with a 2-man team
-Complex Structural MEPF Scanning: Including active public areas and active rail.
Model Contents:
-Includes office, restaurant, retail, industrial, structural, MEPF, and transportation components
Why this tool was selected for your process
-
The previous method used
-
Time / Money saved & the Business Impact
Scan Duration: Completed in 3 days with a 2-man team
Complex Structural MEPF Scanning: Including active public areas and active rail.
Additional Information
Model Specifications:
-Level of Development (LoD): 350
-Includes Materials (Interior & Exterior)
-Includes Architecture, Structure, MEPF and Landscape
Accuracy Assurance:
-Tolerance Standards: Maintained throughout the entire model
-Point Cloud: 0”-⅛”
-Revit Model: 0”-½”
Business Impact
BIM Creation:
-Architectural & Structural Model: Completed in 3 weeks
-MEPF Model: Finalized in 1 week
-Quality Control: Finalized 1 week