This Case Study showcases all 4 of our disciplines, Architecture, Structure, MEPF and Landscape in a single model at our LoD 350 standard. The model contains 3 buildings, 11 storefronts and two rail systems below. Coordinating with the MTA / LIRR was a huge learning experience for us as we continue to work in transportation projects. Project Overview: -Project Type: Commercial with Transportation -Size: Over 32,000 sqft -Scan Duration: Completed in 3 days with a 2-man team -Complex Structural MEPF Scanning: Including active public areas and active rail. Model Contents: -Includes office, restaurant, retail, industrial, structural, MEPF, and transportation components
Why this tool was selected for your process
-
The previous method used
-
Time / Money saved & the Business Impact
Scan Duration: Completed in 3 days with a 2-man team Complex Structural MEPF Scanning: Including active public areas and active rail.
Additional Information
Model Specifications: -Level of Development (LoD): 350 -Includes Materials (Interior & Exterior) -Includes Architecture, Structure, MEPF and Landscape Accuracy Assurance: -Tolerance Standards: Maintained throughout the entire model -Point Cloud: 0”-⅛” -Revit Model: 0”-½”
Business Impact
BIM Creation: -Architectural & Structural Model: Completed in 3 weeks -MEPF Model: Finalized in 1 week -Quality Control: Finalized 1 week -Total Project Duration: Approximately 5 weeks